Driveway Replacement Process
In PreparationLocation services are performed to mark all areas where utility lines lay to ensure no disruption during construction.
The driveway that will be replaced is then demolished & hauled off. Irrigation lines are then inspected for any damage and are repaired or replaced as necessary. Finally, the property sub-base compaction is confirmed. |
In Progress
To begin, the new driveway is set up and forms are positioned at the desired layout.
Laser levels and/or string lines are used to ensure correct water flow & concrete thickness Then horizontal reinforcement bar rods are drilled into the surrounding concrete structures (where needed). The new driveway is then poured as per specs listed below. |
In ConclusionAll forms & construction debris are cleaned and hauled away.
Caution tape is then installed at entrances to prohibit access to new concrete. Lastly, the street is cleaned & pressure-washed where required. |
Specifications |